OPEN TIME 60-120 MINUTES (DEPENDING ON THE CONDITIONS IN THE WORKPLACE)
APPLICATIONS:
STEP 1: APPLY THE GLUE ON BOTH SURFACES.
STEP 2: AFTER WE HAVE FINISHED THE APPLICATION WE WAIT FOR 10 TO 15 MINUTES.
STEP 3: BRING THE TWO SURFACES IN CONTACT AND PRESS EVENLY. THIS CAN BE DONE EVEN AFTER 60 MINUTES. DURING THE 60 MINUTE TIME THE ADHESIVE FILM HAS NO "STING" AT ALL WITHOUT THIS MEANING THAT THE ADHESIVE IS INACTIVE.